AN EVALUATION OF THE ENVIRONMENTAL FACTORS THAT LEAD TO ABANDONMENT OF PUBLIC BUILDING PROJECTS IN THE FEDERAL CAPITAL TERRITORY, ABUJA

TABLE OF CONTENTS
Title Page
Abstract
Table of Contents

CHAPTER 1
1.0       INTRODUCTION
1.1       Background of the Study
1.2       Statement of the Research Problem
1.3 Justification of the Study
1.4 Aim and Objectives
1.4.1    Aim
1.4.2    Objectives
1.5 Scope and Delimitations of the Study
1.5.1    Scope
1.5.2    Delimitations

CHAPTER 2
2. LITERATURE REVIEW
2.1 Introduction
2.1.1    Building Projects
2.1.2    Types of Construction Projects
2.1.2.1 Residential
2.1.2.2 Building
2.1.2.3 Institutional and Commercial
2.1.2.4 Industrial
2.1.2.5 Specialized Industrial Construction
2.1.2.6 Highway Construction
2.1.2.7 Heavy Construction
2.1.3 Project Abandonments
2.2 Characteristics of Abandoned Building Projects
2.3 Project Environmental Factors
2.3.1    Economic and Financial
2.3.2    ConstructionTechnology
2.3.3  Political
2.3.4  Legal Factors
2.3.5  Physical Factors
2.3.6    Socio-cultural Factors
2.3.7    Institutional
2.4 Effects of Building Projects Abandonment on the Environment


CHAPTER3
3.         RESEARCH METHODOLOGY
3.1 Research Design
3.2       Research Method Adopted for the Study
3.3       Population of the Study
3.4       Sampling Techniques
3.5       Sample Size
3.6       Data Collection Instrument
3.7       Administration of Data Collection Instruments
3.8       Method of Analysis
3.8.1 Relative Importance Index (RII)

CHAPTER 4
4.         DATA PRESENTATION, ANALYSIS AND DISCUSSION OFRESULTS
4.1       Breakdown of Administered Questionnaires
4.2       Respondents Profile
4.2.1 Profession of the Respondents
4.2.2 Years of Experience of Respondent
4.2.3 Level of Qualification of Respondent
4.3       Characteristics of Abandoned Public Building Projects in Abuja
4.4 Environmental Factors Leading to Public Building Projects Abandonment
4.4.1    Economic and Financial Factors Leading to Public Building Projects Abandonment
4.4.2    Construction Technology Factors Leading to Public Building Projects Abandonment
4.4.3 Political Factors Leading to Public Building Projects Abandonment
4.4.4 Legal Factors Leading to Public Building Projects Abandonment
4.4.5 Social and Cultural Factors Leading to Public Building Projects Abandonment
4.4.6 Physical Factors Leading to Public Building Projects Abandonment
4.5       Assessment of the Effects of Public Building Projects Abandonment on the Environment

CHAPTER 5
5.         SUMMARY, CONCLUSIONS AND RECOMMENDATIONS
5.1       Summary of Findings
5.2       Conclusions
5.3       Recommendations
5.4 Contribution to Knowledge
5.5 Recommendation for Further Research
REFERENCES

ABSTRACT

The successful implementation of building projects may be impaired without a good knowledge of the environmental factors that contribute to building projects abandonment and this abandonment makes it difficult to achieve the benefit to be derived from the projects. The aim of the study was to evaluate the environmental factors that lead to abandonment of public building projects, with a view to proffering solutions to public building projects abandonments in Abuja . The study identifies the characteristics of abandoned public building projects, examine the environmental factors that are responsible for public building projects abandonment and also assess the effects of public building projects abandonment on the environment. The research adopted the quantitative method in which the checklist was developed to obtain the inventory of abandoned public building projects in Abuja. A structured questionnaire was also designed and administered to the in-house consultants of the F.C.D.A. Data was analyzed using statistical tools like Means, Percentages and Relative Importance Index (RII) and presented using Charts and Tables. The study revealed that 67% of the public building projects are abandoned after the contract period has elapsed. It also revealed that lack of funds constitute about 50% of the factors affecting completion as well as none of the abandoned public building projects achieved 50% completion. The study found that inadequate working capital is the highest ranked factor among the other environmental factors with a RII of 0.87. The study also revealed that cost overrun is the most significant effect of abandonment of public building projects with a RII of 0.81. The research concluded that the inadequate working capital, importation of materials and equipments, instability in governance, type of contract, civil conflicts and unexpected geological condition are the environmental factors that contribute largely and immensely to the abandonment of public building projects. The research recommends that there should be proper cost analysis of the project to be embarked upon.


CHAPTER ONE
1.0       INTRODUCTION
1.1       Background of the Study
The construction industry contributes greatly to the growth of any nation even though it contributes less than the other industries. Therefore, it is a key player in the socio-economic progress of several countries internationally (Usman, Kamau and Mireri, 2014). Also the Nigeria construction industry is a broad variety of loosely incorporated organizations that jointly erect, adjust and restore a large range of different buildings and public engineering projects. The building industry is also defined as financial activities that center on the construction of physical projects, such as buildings and road and rail network, despite of the construction being land or maritime based (Osman, 2006). The success of a project is a very critical issue in the industry.

Unluckily a lot of these projects in Nigeria are out rightly abandoned still at commencement (Olapade and Anthony, 2012). Dahlan (2001) contends that, from the development point of view, the word „abandoned project‟ refers to a project in which the construction job has been delayed, even though planning consent has been approved to the developer. Also, Olapade and Anthony (2012) defined abandoned project as a project in which the client refuse to provide maintenance and working services to a building. However, this study view abandoned building project as a project in which the construction work is incomplete and suspended. Therefore, the importance that the continual abandonment of projects would bring numerous effects on real properties and its values and the financial system cannot be overemphasized since some of the building projects provide the fundamental services that should improve the real...

For more Building Projects click here
================================================================
Item Type: Project Material  |  Attribute: 68 pages  |  Chapters: 1-5
Format: MS Word  |  Price: N3,000  |  Delivery: Within 30Mins.
================================================================

Share:

No comments:

Post a Comment

Select Your Department

Featured Post

Reporting and discussing your findings

This page deals with the central part of the thesis, where you present the data that forms the basis of your investigation, shaped by the...

Followers